TR335

Study of Potential Water Salvage on the Tucumcari Project Arch Hurley Conservancy District Phase I: A Pre-appraisal-level Study of the Potential Amount of Water That May Be Saved, and the Costs of Alternative Methods of Reducing Carriage Losses from District Canals

Type: 
Technical Report
Date Published: 
June 2006
Authors:
J. Phillip King
John W. Hawley
John W. Hernandez
John F. Kennedy
Eluid Martinez

Leave a Reply