The Development of a Coordinated Database for Water Resources and Flow Model in the Paso del Norte Watershed (Phase III) Part III GIS Coverage for the Valle de Juárez Irrigation District 009 (ID-009) (Distrito de Riego 009) Chihuahua, Mexico
Type: Technical Report
Date Published: November 2009
Authors: Alfredo Granados Olivas
Abstract:
This report fulfills the deliverables required by the cooperative agreement between the U.S. Army Corps of Engineers and Texas AgriLife Research (TAES/03-PL-02: Modification No. 3) on behalf of the Paso del Norte Watershed Council. Tasks accomplished in this phase include (a) assess the data availability for expansion of the URGWOM model, identify data gaps, generate data needed from historic data using empirical methods, compile and verify the water quality data for reaches between the Elephant Butte Reservoir, New Mexico and Fort Quitman, Texas; (b) develop the RiverWareTM physical model for the Rio Grande flow for the selected reaches between Elephant Butte Reservoir and El Paso, beginning with a conceptual model for interaction of surface water and groundwater in the Rincon and Mesilla valleys, and within the limits of available data; (c) implement data transfer interface between the coordinated database and hydrologic models.
This Project was conducted by researchers at Texas A&M University (TAMU) and New Mexico State University (NMSU) under the direction of Zhuping Sheng of TAMU and J. Phillip King of New Mexico State University. It was developed to enhance the coordinated database, which was originally developed by the Paso del Norte Watershed Council with support of El Paso Water Utilities to fulfill needs for better management of regional water resources and to expand the Upper Rio Grande Water Operations Model (URGWOM) to cover the river reaches between Elephant Butte Dam, New Mexico, and Fort Quitman, Texas. In Phases I and II of this Project (TAES/03-PL-02), hydrological data needed for flow model development were compiled and data gaps were identified and conceptual model development. The objectives of this phase were to develop a physical model of the Rio Grande flow between Elephant Butte Dam and American Dam by using data collected in the first development phase of the PdNWC/Corps Coordinated Water Resources Database and to enhance the data portal capabilities of the PdNWC Coordinated Database Project.
This report is Part III of a three part completion report for Phase III and provides information on water sources, uses, and GIS of the canals and ditches of the Valle de Juárez Irrigation District 009 (ID 009) in the Juárez Lower Valley, Chihuahua, México. The author explains that the water needs of this region have changed in recent years from being primarily for agricultural purposes to domestic and industrial uses currently. Also, the United States wanted to assess and identify new data sources on a GIS format for the Mexican side. Therefore, this project produced several maps with the location of channels and ditches along the Valle de Juárez Irrigation District. This information also will support water planning of the Valle de Juárez Irrigation District 009. The maps were produced from existing digital data regarding water resources and by adding thematic layers such as soil salinity and soil texture from analog maps. ASTER satellite imagery and official panchromatic aerial photography were used to produce the maps.
Download the full report in PDF format:
Attachment | Size |
---|---|
tr348iii.pdf | 1.55 MB |
Keywords: water quality, water flows, Paso del Norte watershed, GIS, Valle de Juárez Irrigation District 009 standard, land use change sprawl